A.equal to the chains they are connecting B.25% more than the chains they are connecting C.50% more than the chains they are connecting D.100% more than the chains they are connecting
A.half the breaking strength of the mooring line B.the full breaking strength of the mooring line C.the maximum expected tension of the mooring line D.50% over the working tension of the mooring line
A.removed from the anchor chain B.connected to a buoy at the anchor C.stripped back to the rig and secured D.connected to a buoy halfway down the chain